Sustainability & Responsibility

left arrow

We are focusing on the UN’s #7 Sustainability Development Goal: Affordable and Clean Energy and we invite you to pledge your house to the cause.

left arrow

We support PMI’s 2022 Hours for Impact initiative where we have committed to assisting local organizations in executing their projects

Our team also volunteers to help organize events in their technical and personal circles, most recently the PMI’s 2022 Revelations Symposium.

We are always looking for additional causes to support, from river and lake cleanups to teaching and volunteer opportunities to many others.

Feel free to reach out at any time.

GHG Emissions

Private Owner - Statutory inspection of dam X0002706

Description de projet

The owner of dam X0002706 mandated Equinox Construction Services (ECS) to undertake a Statutory Inspection of the dam, including a visual analysis
of all the components, including but not limited to, the piers, the spillways, the toe of the dam, the rail systems and the intake, the upstream impoundment along with the downstream stretch.

Following this inspection, ECS prepared a Statutory Inspection Report which included, among other aspects, a description of how the inspection was carried out, ECS’ observations on annotated photographs, our recommendations with respect to the dam’s current condition and status, and finally a preliminary estimate of the construction costs associated with our recommendations.

During the inspection, particular attention was given to elements such as Public Safety Around Dams, environment protection measures and the structural elements.

CLIENT

Individual dam owner

LOCATION

Near the village of Ogden, QC

DATE

Inspection carried out in August 2021 and the repport was supplied before the end of 2021

Team

Bryan Moloughney Ing., M.Ing., PMP.

COST

N/A

PROFESSIONAL FEES

3 400 $

Services Provided

  • Site visit at dam X0002706 in Ogden
  • Carried out a visual inspection of the dam
  • Analysis of the health and status of the various
    components and systems of the dam
  • Prepared a Statutory Inspection Report
  • Developed a list of recommendations
  • Estimated the construction and repair costs along with a
    timeline
  • Attestation of the dam’s current state

Challenges

  • We were required to develop an attestation of the dam’s
    condition along with our recommendations without any
    previous inspection records
  • The intake was well clogged which limited the precision
    of our recommendations

Digital Twin