The Ministry of Natural Resources and Forestry mandated Equinox Construction Services (ECS) to fabricate and install a lifeline on the new monorail system, on 10 different dams in the Northeast District.
The work included measuring the spacing between the posts, sourcing the lifeline components that respected the typical details, designing a clamped connection for the removable steps and all the traveling and site work required to deliver the project to the Client’s specifications.
With these lifelines and removeable steps, the stoplog lifting and lowering operations will now be more secure and move accessible.
In fact, an important quantity of MNRF dams are receiving new monorail systems along with new lifelines in order to reduce the risks involved with the operation of their infrastructure.