Equinox Construction Services (ECS) was mandated by Limoges et Fils to provide support for the Lac Morin dam rehabilitation project. The work consisted of demolishing the existing dam, X0001528, and the construction of a new, reinforced concrete weir and spillway, as well as the construction of a gabion wall and various erosion protection works.
The project also included the installation of post-tensioned anchors, various cofferdams, embedded parts, and the commissioning of a water level control system.
ECS was in charge of the Project & Construction Management, and responsible for developing the preparatory documents for mobilization (technical data sheets, work methods, cofferdam and formwork design, Environmental Protection Action Plan, etc.), as well as periodically updating the work schedule, managing change requests, coordinating various subcontractors, site supervision and carrying out pre- and post-construction bathymetric surveys.