Sustainability & Responsibility

left arrow

We are focusing on the UN’s #7 Sustainability Development Goal: Affordable and Clean Energy and we invite you to pledge your house to the cause.

left arrow

We support PMI’s 2022 Hours for Impact initiative where we have committed to assisting local organizations in executing their projects

Our team also volunteers to help organize events in their technical and personal circles, most recently the PMI’s 2022 Revelations Symposium.

We are always looking for additional causes to support, from river and lake cleanups to teaching and volunteer opportunities to many others.

Feel free to reach out at any time.

GHG Emissions

GoC - In-Service Support for Rideau Falls De-Icing System

Description de projet

PWSGC mandated Equinox Construction Services (ECS) to carry out In-Services Support Services, including inspections, deficiency correction, start-up and shut-down procedures, and maintenance of the de-icing system within the Rideau Falls Dam complex. The Dam complex uses stoplogs to manually control the water level on the Rideau Canal and this location has a considerable ice build up during the winter months. The de-icing system is used to ensure the continuous operation of the dam and carries high-pressure steam in order for the operators to connect de-icing wands to connection points and free the stop logs.

The nature of the work provided by ECS consisted of managing the multi-year contract and various Task Authorizations (maintenance, upgrades and alterations), managing the specialty contractors, updating existing drawings of the de-icing system to include support locations and identifying points of interest for further NDT, annual inspection and maintenance of the de-icing system, ultrasonic thickness gauging to monitor points of interest for corrosion, and assistance with system start up and shut down during the period of operation.

CLIENT

Public Works and Government Services (PWSGC), Government of Canada

LOCATION

Ottawa, ON

DATE

August 2023-August 2026 (3 years) with option of extension to 2029 (6 years total)

Team

COST

Base Contract $450 000 with extension up to $1 500 000

PROFESSIONAL FEES

Included in cost

Services Provided

  • Reviewed existing information and created new isometric drawings to include the systems, the inspection work and all modifications during the contract
  • Annually executed system start up procedures to warm pipe and ensure system was safely filled with pressurized steam
  • Annually executed system shut down procedures to empty system of steam and flush with pressurized nitrogen
  • Annually inspected all elements of system to determine necessary points of maintenance
  • Performed NDT on years 1 and 6 to monitor pipe gauge thickness at specified locations and system wear

Challenges

  • Managing critical and secure infrastructure
  • Timing work with ongoing operations
    • Coordinating multiple subtrades