Sustainability & Responsibility

left arrow

We are focusing on the UN’s #7 Sustainability Development Goal: Affordable and Clean Energy and we invite you to pledge your house to the cause.

left arrow

We support PMI’s 2022 Hours for Impact initiative where we have committed to assisting local organizations in executing their projects

Our team also volunteers to help organize events in their technical and personal circles, most recently the PMI’s 2022 Revelations Symposium.

We are always looking for additional causes to support, from river and lake cleanups to teaching and volunteer opportunities to many others.

Feel free to reach out at any time.

GHG Emissions

Genifab - Expert Review Services for a Condifential, Large Civil Construction Claim

Description de projet

Genifab mandated Equinox Construction Services (ECS) to assist with the review, analysis and preparation of various documents to be used during litigation involving a major construction claim. While the nature of the project, client and situation is protected by a Non-Disclosure Agreement, the major claim involved the use of a design-build contract, during the COVID-19 pandemic, which was heavily impact by supply chain disruptions.

ECS joined Genifab's review team and analyzed the bid documents, the assumptions and strategies used during the Bid Process, along with the estimates, quantities, drawings and quotes. ESC specializes in the analysis of Civil Work, notably the Excavation and Reinforced Concrete domains while equally assisting with the Process, Electrical and Ventilation domains.

By the end of the mandate, ECS contributed to justifying the Client's position during their major construction cost claim.

CLIENT

Genifab Consultants Inc.

LOCATION

Montreal, QC

DATE

Analysis, estimates and report: 2021 - 2022

Team

COST

CONFIDENTIAL

PROFESSIONAL FEES

CONFIDENTIAL

Services Provided

  • Review of contractual documents
  • Review of communications, relationships, quotes and contracts
  • Re-estimation of various quantities and assessment of the accuracy of the original estimates
  • Review the accuracy and relevance of the quotes received, and organize the quotes with the bid budget
  • Preparation of review notes and meetings with various stakeholders involved
  • Review the various risks, opportunities and missed items

Challenges

  • The confidential nature of the client, site and situation was to be respected at all times
  • Retracing the steps taken in the bid process, with little information, was often challenging