Sustainability & Responsibility

left arrow

We are focusing on the UN’s #7 Sustainability Development Goal: Affordable and Clean Energy and we invite you to pledge your house to the cause.

left arrow

We support PMI’s 2022 Hours for Impact initiative where we have committed to assisting local organizations in executing their projects

Our team also volunteers to help organize events in their technical and personal circles, most recently the PMI’s 2022 Revelations Symposium.

We are always looking for additional causes to support, from river and lake cleanups to teaching and volunteer opportunities to many others.

Feel free to reach out at any time.

GHG Emissions

Dam Statutory Inspection X002998

Description de projet

The City of Saint-Eugène-de-Guigues, owner of dam X0002998, mandated Equinox Construction Services (ECS) to undertake a Statutory Inspection of the dam, including a visual analysis of all components, including, but not limited to: Piers, closure dikes, beam handling systems, retaining and gabion walls, as well as the access systems, the discharge canal, and the upstream impoundment, along with the downstream stretch and the tailrace invert.

Following this inspection, ECS prepared a Statutory Inspection Report including, among other aspects, a description of how the inspection was conducted, ECS's observations (with annotated photos), recommendations as to the current condition of the dam and its status, and finally a preliminary estimate of the construction costs associated with the recommendations.  

This inspection is required by the Loi sur la sécurité des barrages and in line with the Réglement sur la sécurité des barrages.

During the inspection, particular attention was given to elements such as: Public Safety Around Dams, Environmental Protection, and the condition of structural elements.

CLIENT

City of Saint-Eugène-de-Guigues

LOCATION

City of Saint-Eugène de Guigues, Quebec

DATE

Inspection carried out in July 2024 and report submitted in August 2024

Team

Bryan Moloughney, Project Manager

COST

PROFESSIONAL FEES

5 000 $

Services Provided

  • Visit to dam X0002998 at Baby Lake
  • Visual inspection of dam
  • Condition analysis of various dam components and systems
  • Preparation of a Statutory Inspection Report
  • Development of a list of recommendations
  • Estimate of costs
  • Certification of current dam condition

Challenges

  • The inspection was carried out while the dam was in operation.
  • Remote site (Témiscamingue), requiring special coordination.

Digital Twin