Sustainability & Responsibility

left arrow

We are focusing on the UN’s #7 Sustainability Development Goal: Affordable and Clean Energy and we invite you to pledge your house to the cause.

left arrow

We support PMI’s 2022 Hours for Impact initiative where we have committed to assisting local organizations in executing their projects

Our team also volunteers to help organize events in their technical and personal circles, most recently the PMI’s 2022 Revelations Symposium.

We are always looking for additional causes to support, from river and lake cleanups to teaching and volunteer opportunities to many others.

Feel free to reach out at any time.

GHG Emissions

Dam Statutory Inspection Lac Smith X00005453

Description de projet

The owner of dam X0005354 mandated Equinox Construction Services (ECS) to undertake a Statutory Inspection of the dam, composed of a visual analysis of all the components, including but not limited to, the piers, the spillway, the toe of the dam, the access systems, the headpond and the discharge canal.  

Following this inspection, ECS prepared a Statutory Inspection Report which included, among other aspects, a description of how the inspection was carried out, ECS' observations (with annotated photos), recommendations with respect to the dam's current condition and status, and finally a preliminary estimate of the construction costs associated with the recommendations.

This inspection is required by the Loi sur la sécurité des barrages and in line with the Réglement sur la sécurité des barrages.

During the inspection, particular attention was given to elements such as Public Safety Around Dams, environmental protection measures and the structural defects in the reinforced concrete structure.  

CLIENT

Private dam owner

LOCATION

Lac Saguay, Québec

DATE

Inspection carried out in August 2023 and the report was supplied during September 2023

Team

Bryan Moloughney, Project Manager

COST

PROFESSIONAL FEES

3 500 $

Services Provided

  • Site visit at dam X0005453 in Lac Saguay
  • Carried out a visual inspection of the dam
  • Analysis of the health and status of the various components and systems of the dam
  • Prepared a Statutory Inspection Report
  • Developed a list of recommendations
  • Estimated the construction and repair costs along with a timeline
  • Attestation of the dam's current state

Challenges

  • We were required to develop an attestation of the dam's condition along with our recommendations without any previous inspection records
  • The intake was well clogged which limited the precision of our recommendations

Digital Twin