Equinox Construction Services (ECS) was mandated as part of the Three Corner Lake Dam rehabilitation project to coordinate and execute corrective work on the existing structure.

The mandate aimed to extend the service life of the dam by restoring the integrity of its structural components, while maintaining a high level of regulatory compliance and public safety. The work included the rehabilitation of deteriorated concrete sections, improvements to selected hydraulic components, and the implementation of environmental control measures tailored to the site.

Expertise
  • Dam rehabilitation
  • Structural concrete works
  • Construction management in remote environments
  • Multidisciplinary coordination
  • Regulatory compliance and dam safety
  • Dam rehabilitation
  • Structural concrete works
  • Construction management in remote environments
  • Multidisciplinary coordination
  • Regulatory compliance and dam safety

Timeline

2 months

Cost

Professional fees

250 000$

The Challenge: Efficiently Intervening on an Existing Structure in a Sensitive Natural Environment

The rehabilitation of the Three Corner Lake Dam took place in a context typical of aging hydraulic infrastructure, characterized by restricted site access, strict environmental constraints, and the need to intervene without compromising the overall stability of the structure.

The main challenge was to plan and execute targeted corrective work while ensuring crew and public safety, maintaining strict control of water levels, and protecting the surrounding natural environment. All interventions also had to comply with applicable provincial regulatory requirements governing hydraulic structures.

In this type of mandate, precise planning and close coordination among stakeholders are essential to minimize operational and environmental impacts, while ensuring the long-term performance and durability of the infrastructure.

Three Corner Lake Dam Rehabilitation
Three Corner Lake Dam Rehabilitation
Three Corner Lake Dam Rehabilitation

Intervention by Equinox Construction Services

Equinox Construction Services acted as construction manager and rehabilitation coordinator for the dam.

Our team was responsible for:

  • Detailed planning of work sequences
  • Coordination of specialized subcontractors
  • Supervision of concrete repairs and structural corrective work
  • Quality control and monitoring of technical requirements
  • Proactive management of site-related risks

Technical documentation was also prepared to guide execution, including:

  • Site-adapted work methodologies
  • Environmental management plans
  • Dewatering or hydraulic control sequences
  • Monitoring reports and technical documentation

Upon completion, the dam achieved an improved level of structural integrity, securing its operation and extending its useful service life.

Services Provided

  • Project and construction management
  • On-site engineer presence
  • Procurement, logistics, and material delivery, including management of alternative products and supply shortages
  • Logistics, schedule, and product delivery management
  • Oversight of work execution and Quality Assurance / Quality Control (QA/QC) requirements
  • Responsibility for project budget and schedule
  • Management of change processes and project-related communications

Team

Bryan Moloughney
Bryan Moloughney
P.Eng., M.Eng.M., PMP

A Structured Rehabilitation Approach to Ensure the Longevity of a Strategic Asset

Rehabilitating an existing dam goes beyond correcting visible deficiencies. It requires a thorough understanding of the structure’s overall behavior, its operational history, and the site-specific hydraulic constraints.

In the case of the Three Corner Lake Dam, Equinox Construction Services leveraged its expertise in hydraulic infrastructure rehabilitation to prioritize critical interventions, optimize work sequencing, and reduce the technical and environmental risks associated with the site. Particular attention was also given to maintaining clear and structured communication with the client throughout the project.

Our field-driven approach, combined with a strategic risk perspective, enables us to deliver realistic, durable solutions tailored to the specific conditions of each dam.

Five diverse coworkers standing and smiling in a modern office with a wooden desk and computer behind them.
“Dam rehabilitation requires a comprehensive understanding of the structure, as well as rigorous field execution. Our role is to transform a technical diagnosis into structured, safe, and durable interventions.”
Bryan Moloughney, P.Eng., M.Eng.M., PMP
Additional Resources
Printable project sheet